June 16, 2026
8 min read

Nuclear Waste Management Facility Performance Report - Q1 2026 Results

Accent: wq4lyzk5cr8j
Kenetic_right

Performance update

As part of our commitment to keep you informed, this report tracks performance for Ontario Power Generation’s Nuclear Waste Management facilities in the areas of safety, operations, and the environment. It also summarizes significant accomplishments achieved during the first quarter of 2026.

Ontario Power Generation operates three nuclear waste facilities across the province located in Darlington, Pickering & Bruce County. Spent fuel taken from the reactors is stored at each facility locally after it has been cooled. Low and intermediate level materials are stored at OPG’s Western Waste Management Facility.


A dial graphic indicating "green" for excellent performance.0.0 TRIF

A dial graphic indicating "green" for excellent performance.0.0 incidents

Safety

Total Reportable Injury Frequency (TRIF)

TRIF is a measurement of the number of injuries involving OPG employees that result in a fatality, lost time, restricted work or medical treatment per 200,000 hours worked. The Year-to-date TRIF is reported as a 12-month rolling average. The year-to-date actual is 0.00 which is below the year-to-date target of 0.47.

Transportation Safety

The transportation of waste to our Western facility from Darlington, Pickering and Bruce Power is managed by experienced and skilled drivers. In this quarter, all shipments were made safely and accident-free. The fleet safely travelled approximately 150,000 additional kilometres marking over 7 million kilometres safely travelled to-date.

A dial graphic indicating "green" for excellent performance.0 spills

Environment

Spills to the environment

There were no spills to the environment at our facilities that were reportable to a regulatory authority. The total number of events for the year was below the year end target of 2.0. For detailed environmental information, please refer to the environmental data reports available on our Regulatory Reporting page.

A dial graphic indicating "green" for excellent performance.PWMF - 24

A dial indicating 'yellow' for mediocre performance.DWMF - 10

A dial graphic indicating "green" for excellent performance.WWMF - 19

Operational Performance

Pickering Waste Management Facility (PWMF)

A total of 24 Dry Storage Containers (DSC) were transferred up to the end of Q1 which totals 24 of the 80 year-end transfer target, slightly exceeding the year to date target.

Darlington Waste Management Facility (DWMF)

A total of 10 Dry Storage Containers (DSC) were transferred up to the end of Q1 totaling 10 of the 60 year-end transfer target, slightly below the year to date target.

Western Waste Management Facility (WWMF)

A total of 19 Used Fuel Dry Storage Containers (DSC) were transferred up to the end of Q1 which is above the year to date target of 14 transfers.

A dial graphic indicating "green" for excellent performance.984 m3

Waste Minimization

As of the end of Q1, a total of 2,984 cubic metres of solid low-level waste has been processed through incineration. This is above the year to date target of 743 cubic metres of incinerated low-level solid waste.

Questions?

Please contact Jennifer Knox, Director - Nuclear Stakeholder Relations, through the form below.

Accent: 0i7howznx3tu
Kenetic_left

Subscribe and stay informed

Sign up to receive the latest news, project updates, and event information from OPG.

Lightbox: subscribe_cta