June 17, 2025
8 min read

Nuclear Waste Management Facility Performance Report - Q1 2025 Results

Accent: c5ma3l6guev0
Kenetic_right

Performance update

As part of our commitment to keep you informed, this report tracks performance for Ontario Power Generation (OPG)’s Nuclear Waste Management Facilities in the areas of safety, operations, and the environment. It also summarizes significant accomplishments achieved during the first quarter of 2025.

OPG operates three nuclear waste facilities in Darlington, Pickering and Bruce County. Used fuel is removed from the reactors and cooled inside the station’s fuel bay. Low and Intermediate Level waste is processed and then stored at OPG’s Western Waste Management Facility.


A dial graphic indicating "green" for excellent performance.0.0 TRIF

A dial graphic indicating "green" for excellent performance.0.0 incidents

Safety

Total Reportable Injury Frequency (TRIF)

TRIF is a measure of the number of injuries involving OPG employees that result in a fatality, lost time, requiring restricted work or requiring medical treatment per 200,000 hours worked. The current TRIF average sits at .0, below the year-to-date target of 0.47. The year-end target is not to exceed 0.47.

Transportation Safety

The transportation of waste to our Western facility from Darlington, Pickering and Bruce Power is managed by experienced and skilled drivers. During Q1, all shipments were made safely and accident-free and the fleet travelled 122,041 kilometres. As of June 2, 2025, 235,870 kilometres have been travelled this year.

A dial graphic indicating "green" for excellent performance.0 spills

Environment

Spills to the environment

In this quarter, there were no spills to the environment at our waste facilities that were reportable to a regulatory authority. For detailed environmental information, please refer to the environmental data reports available on our Regulatory Reporting page.

A dial graphic indicating "green" for excellent performance.PWMF - 27

A dial graphic indicating "white" for good performance.DWMF - 3

A dial graphic indicating "green" for excellent performance.WWMF - 26

Operational Performance

Pickering Waste Management Facility (PWMF)

A total of 27 Dry Storage Containers (DSC) were transferred in Q1, which totals 27 of the 80 year-end transfer target for 2025.

Darlington Waste Management Facility (DWMF)

A total of 3 Dry Storage Containers (DSC) were transferred during Q1, totalling 3 of the 45 year-end transfer target for 2025.

Western Waste Management Facility (WWMF)

A total of 26 Used Fuel Dry Storage Containers (DSC) were transferred in Q1, totalling 26 of the 110 year-end transfer target for 2025.

A dial indicating 'yellow' for mediocre performance.889 m3

Waste Minimization

In Q1, a total of 889 cubic metres of low-level waste was processed through incineration. This was below the year-to-date target of 907 cubic metres. The goal is to process 3,510 cubic metres by the end of 2025.

Questions?

Please contact Jennifer Knox, Director - Nuclear Stakeholder Relations, through the form below.