September 16, 2025
7 min read

Darlington Nuclear Performance Report – Q2 2025 Results

Accent: fd2lo8a35ytq
Kenetic_right

Performance update

As part of our commitment to keep you informed, this report tracks performance for Ontario Power Generation’s (OPG’s) Darlington Nuclear in the areas of safety, operational and environmental performance, and significant accomplishments during the second quarter of 2025.

A dial graphic indicating "green" for excellent performance.11.2 TWh

Electricity production

The electrical energy generated, minus station needs

OPG’s nuclear electricity generation for Q2 of 2025 totaled 9.7 terawatt hours (TWh).

In Q2 2025, Darlington Nuclear produced 5.6 TWh of electricity, which was 13 per cent of the electricity produced in Ontario. This year to date, Darlington Nuclear’s electricity generation has totaled 11.2 TWh.

A dial graphic indicating "green" for excellent performance.98.55% UCF

Reliability

Unit capability factor

By the end of Q2 2025, Darlington’s Unit Capability Factor (UCF) this year to date is higher (98.55) than in Q2 2024, primarily as a result of a decrease in the number of days the station has been shut down for maintenance outages.

A dial graphic indicating "green" for excellent performance.0 spills

Environment

Spills to the environment

During Q2 2025, there were no spills to the environment at Darlington Nuclear reportable to a regulatory authority.

A dial graphic indicating "green" for excellent performance.0.00 TRIF

Safety

Total Recordable Injury Frequency

Total Recordable Injury Frequency (TRIF) measures the number of injuries involving OPG employees that result in a fatality, lost time, requiring restricted work and requiring medical treatment per 200,000 hours. By the end of Q2 2025, the 12-month rolling average TRIF was 0.00 injuries per 200,000 hours worked.

About OPG’s Nuclear Generating Stations

OPG owns and operates the Pickering and Darlington Nuclear Generating Stations. The two stations have a combined generating capacity of about 4,700 megawatts with Darlington Unit 4 currently on refurbishment. Accounting for 23.5 percent of the electricity produced in Ontario in Q2, OPG’s nuclear units generated 9.7 TWh.

Questions?

Please contact Jennifer Knox, Director - Nuclear Stakeholder Relations, through the form below.