Skip Ribbon Commands
Skip to main content
Sir Adam Beck Pump Generating Station

Sir Adam Beck Pump Generating Station

"Master of disaster" Tali Serota plays a key role in dam and public safety at OPG: https://t.co/rWcZqysema… https://t.co/UpnHW5JnMT

Fri Jul 21 16:45:11

Tour our 100 year old Calabogie station in eastern #Ontario on July 29, 1-5 pm. Grab a shuttle bus at Barnet Park:… https://t.co/CLEZorn1PE

Thu Jul 20 18:15:06

RT @TackleShare: At @SandbanksPP tomorrow from 1-4pm for #healthyparkshealthypeople. Free 3 hour fishing workshop with lots of #fishing inv…

Thu Jul 20 17:57:10

Sir Adam Beck Pump Generating Station



PLANT GROUP: Niagara Plant Group
DRAINAGE BASIN: Lake Erie
RIVER: Niagara River
NEAREST POPULATION CENTRE: Queenston, Ontario
IN SERVICE DATE: 1957/1958
NUMBER OF UNITS: 6
CAPACITY: 174 MW
CONTROL: Remote from Sir Adam Beck II​

INTERESTING FACTS:

  • The 174 megawatt Sir Adam Beck Pump Generating Station and its 300-hectare reservoir were constructed concurrent with the Sir Adam Beck II Generating Station.
  • Water diverted to the Sir Adam Beck generating complex is typically pumped into the reservoir at night so it can be used to generate electricity during subsequent periods of high electricity demand. Six mixed-flow variable-pitch reversible pump-turbines are installed at the pump generating station. The six pumps are capable, in a period of about eight hours, of filling the reservoir.
  • The pumped-storage scheme enables more effective use than could otherwise be made of the water that is available for power production under the Niagara Diversion Treaty of 1950. It offers a method for translating what would be surplus energy at times of low demand into primary energy at times of high demand. The change over from turbine to pumping sequence is accomplished in a matter of minutes and occurs several times each day.